500 Tons METAL STRUCTURE (PRIMARY WATER COOLED DUCT GROUP)

Cargoes were picked up from different warehouses in Gebze and brought to Haydarpa?a port with inland transportation, the ship was loaded with the survey and delivered to Mostaganem.