34-piece aircraft were disassembled at Çigili Air Base and loaded on atrack special equipment after Lashing operations. They transported to Izmir Aliaga after survey operations. Then they were loaded to the BB ship and transported to Karachi Port. For this purpose, operation was carried out at Izmir Çigili Airport for 3 months with special permission.